Brussels airport has to carry out runway rehabilitation
Thorough inspections of runway 25L/07R carried out over the past week have indicated that short-term maintenance is required to ensure the runway's health and safety. The
Below you will find the search result for the keyword you are looking for.
If you have any questions, you can also contact Aviation.Direct simply and easily here.
Quick links:
International | Military | Austria | Germany | Switzerland | Tourism | Trip reports | Travel Tips | Service & Jobs | Newsletter | “To Go” offline magazine
Thorough inspections of runway 25L/07R carried out over the past week have indicated that short-term maintenance is required to ensure the runway's health and safety. The
With the beginning of the cold season, the winter service at Munich Airport also starts: From next Tuesday, November 1st, the specially trained employees will be available around the clock. The winter service can move out at any time if necessary
After eight months of rolling use of the two runways at BER, both runways will be used simultaneously again from December 1st. The decisive factor for this decision was to ensure stable flight operations even in wintry weather conditions
The emergency exercise “MC FLY 21” took place yesterday at Zurich Airport under the supervision of the Federal Office for Civil Aviation (FOCA). The EU and the international civil aviation organization ICAO stipulate that at international airports with regular scheduled flights all
After extensive renovation work has been completed and the instrument landing system has been calibrated, the northern runway will be put back into operation on Saturday, October 2nd, 2021. Concrete and asphalt surfaces were partially renewed, taxiway curves were adjusted and
Parachute team remembers the terrorist attacks: The Cypres demo team completed iconic parachute jumps at Paderborn / Lippstadt Airport on Saturday. The local airport fire brigade was part of this emotional event. 20 years after the terrorist attacks
After the withdrawal of the USA and its allies from Afghanistan, the airport in the capital Kabul has been reopened, according to the emirate of Qatar. The runway was repaired in cooperation with Afghan authorities, said
As planned, the runway (SLB) north at Leipzig / Halle Airport went back into operation on September 1st. An Airbus A321 from the vacation airline Condor was the first aircraft to land on the renewed 3.600 meter runway. While
Paderborn / Lippstadt Airport is reviving a very popular event: the 31th Airport Run will start at the home port on Sunday, October 7st. The start of this fun run, scheduled for 12.30 p.m., takes place on the start
For the time being, Munich Airport will not get a third runway. This was stated by Bavaria's Prime Minister Markus Söder in a speech at the CSU parliamentary group meeting. In view of the massive slump in air traffic due to the corona pandemic, it will be under his term in office